Skip to content

SPCC · 40 CFR 112 · free 3-minute check

Do you need an SPCC plan?Find out in 3 minutes.

SPCC applies if you store over 1,320 gallons of oil above ground (counting only tanks 55 gal and up), or 42,000 gal buried. Penalties run up to $68,445 per day under the Clean Water Act. Enter your tanks: we apply 40 CFR 112 and show a Tier I / Tier II / not-subject verdict with the reasoning. If a plan is already certified, PlanKeep keeps it alive: deadline calendar, monthly inspections, amendments and the audit package.

No credit card · logic per 40 CFR 112.1(d), 112.2, 112.3(g)

What an inspector asks for: signed inspection records kept 3 years 112.7(e), annual briefings 112.7(f), amendments inside 6 months 112.5(a), five-year review statement 112.5(b): all in one package.

  • Records kept 3 years
  • Priced per facility, not per seat
  • US-only · 40 CFR 112

Informational assessment only. Not legal advice, not PE certification.

Facility
Dana Fleet Yard
Access
Owner

54

readiness score / 100 · 1 overdue

Monthly visual inspection

112.7(e)
Overdue · Oct 1

Plan amendment

112.5(a)
Due Nov 28 · 42 days

Five-year review

112.5(b)
Oct 4, 2027

One-click audit package

Ready

SHT 01 · SPCC-2026 · LIVE RECORD

01 · The plan becomes deadlines

Your deadlines, generated from the plan you already paid for.

PlanKeep reads the obligations your plan already sets: annual discharge prevention briefings 112.7(f), the five-year plan review 112.5(b), amendments due within 6 months of a change that materially affects your discharge potential 112.5(a). Each lands on one calendar with its citation attached.

02 · The deadlines become records

Your inspections, run. Your records, kept three years.

The facility-wide runner walks 30 checkpoints in 5 groups: photos where they matter, findings closed through a clear lifecycle, signed records kept 3 years under 112.7(e). Just got the notice with no history behind it? The Inspection Readiness Report shows where you stand.

03 · The records become the audit

Your audit, one click. Your clients, up to sixty.

The audit package assembles your plan, calendar, and closed findings the way an inspector expects to read them. Consultants run the same play across up to 60 client facilities: invitations in two clicks, amendment alerts whenever a registry changes. Plans from $69/mo; partners from $499/mo.

The alternative

A checklist has boxes. Your plan has deadlines.

Generic inspection platforms are good at running a form. SPCC compliance is a document lifecycle: the plan sets obligations, and the rule sets deadlines. Eight places where that difference shows up, checked side by side:

Handled Partial Not handled

3-year record retention

112.7(e)
PlanKeepSigned records kept with the plan for the full retention cycle
Checklist appsSome free tiers delete inspection records after 3 months
Binder, sheetsPaper records survive only as long as the person who filed them

Container registry and capacity math

PlanKeepAboveground gallons auto-summed against the 1,320 / 5,000 / 10,000 thresholds
Checklist appsNo container registry; the gallon math stays manual
Binder, sheetsSpreadsheet sums rebuilt by hand every time a tank changes

Calendar generated from plan metadata

112.7(f)112.5(b)
PlanKeepMonthly visuals, annual briefings and the five-year review land as dated obligations
Checklist appsRecurring reminders configured by hand, with no link to the plan
Binder, sheetsNo calendar; deadlines live in prose on the plan pages

Amendment clock on registry change

112.5(a)
PlanKeepAdd a tank and an amendment task opens with the 6-month deadline
Checklist appsAdding an item changes nothing upstream
Binder, sheetsNobody recomputes the deadline until an inspector asks

One facility-wide audit package

PlanKeepRegistry, inspections, findings and logs exported the way an inspector expects
Checklist appsExports are per-inspection PDFs
Binder, sheetsAssembled by hand from loose records

Inspection records with photos

PlanKeepPhotos attach where they matter and stay with the signed record
Checklist appsPhotos are supported on form fields
Binder, sheetsPhotos printed or filed apart from the record

Findings lifecycle, open to verified

PlanKeepEvery finding moves open, assigned, corrected, verified, with dates
Checklist appsA checkbox closes; nothing tracks what happens after the visit
Binder, sheetsCorrections tracked verbally, if at all

Readiness report with no history

PlanKeepInspection Readiness Report for facilities that just received the notice
Checklist appsNothing to export until records accumulate
Binder, sheetsNo structured answer to a first inspection

Comparison reflects publicly documented capabilities of general-purpose checklist tools as of October 2026. Binder and spreadsheet marks assume a diligently kept system; a disciplined facility can satisfy the rule that way too. PlanKeep exists for the days that discipline slips.

Common objections

Seven questions before you commit

The same seven questions come up in every conversation with a facility owner or an EHS lead. Straight answers, with the citations where they belong.

Q1We already have a PE-certified SPCC plan.
The certification is a snapshot; the obligations keep running between certifications. PlanKeep reads your plan's own metadata into a deadline calendar: monthly visual checks, annual integrity inspection elements per your industry standard, discharge prevention briefings 112.7(f), and the five-year review 112.5(b). A PE stamp does not pause any of them.
Q2Our consultant handles SPCC for us.
Your consultant writes and certifies the plan, but the deadlines, inspections and records belong to the facility. PlanKeep keeps your records under your login, so the audit package an inspector asks for comes from your data, not from whoever still has the binder. Consultant mode lets your consultant watch up to 60 client facilities and get amendment alerts while every record stays yours.
Q3What if we get inspected with no inspection history?
Generate the Inspection Readiness Report on the spot. It assembles the container registry with capacity math against the 1,320 / 5,000 / 10,000-gallon thresholds, the obligations already on the calendar, and every finding closed since you started. It does not invent history; it shows an inspector exactly where you stand today.
Q4We track everything in spreadsheets today.
A spreadsheet stores what someone typed; it never opens the amendment task with the 6-month clock of 112.5(a), and it never enforces the 3-year retention of 112.7(e). PlanKeep generates deadlines from plan metadata and timestamps every inspection with photos and a findings lifecycle, so the record exists before anyone asks for it.
Q5What happens when we add a tank?
The container registry re-sums aboveground capacity against the 1,320 / 5,000 / 10,000-gallon thresholds and flags your Tier status the moment it changes. Adding capacity is a material change under 112.5(a): an amendment task opens with the 6-month deadline, so the plan gets updated while the clock still runs.
Q6How long are records kept?
Three years, per 112.7(e): signed inspection records with photos and the full findings lifecycle stay attached to the plan. Nothing expires at 30, 60 or 90 days the way some free checklist tiers delete them.
Q7Is this legal advice or PE certification?
No. PlanKeep is an informational assessment and a record system: it organizes your obligations and your evidence. It is not legal advice and not PE certification; where the rule requires a PE, your plan still carries one.

Start here

The plan is written.Keep it that way.

Run the 3-minute check, then let PlanKeep run the deadlines: inspections, briefings, amendments, the five-year review.

Free check · priced per facility · records kept 3 years · US-only

Do I need an SPCC plan? Free check